Commercial EV Charging
Workplace and commercial EV charging starts with how vehicles are used, where they park and what the existing supply can support. We survey the site, plan suitable charging capacity and provide a clear installation route for staff, visitors or fleets.
Charging that works around your site
Once the charge points are in place, staff can top up vehicles during the working day instead of arranging charging stops. Visitors have a clear, designated place to charge, without cables crossing access routes.
For a fleet, charging can fit around departures and returns. We match the installation to the vehicles using the site, available parking and the time each vehicle is stationary. That helps prevent a queue of vehicles waiting for a point.
The finished installation is safe, tidy and straightforward to use. We route cabling carefully, protect equipment from everyday traffic and label the controls clearly. Your team has a practical charging area that supports normal site operation, rather than an installation that creates another task for facilities staff.

Charging planned around your site
An office may need staff access, a retail site public payment, and a depot controlled fleet access. We also account for lease terms, planning constraints, meter arrangements and future expansion, so the charging setup fits how the site is managed.
Shared workplace parking
When several teams use the same car park, we plan access by bay and charging priority. Load management helps prevent the points drawing more power than the site can support.
Limited electrical capacity
An older commercial supply may not support several chargers at full output. We check the incoming supply, distribution equipment and cable routes, then set charging capacity around what the site can safely provide.
Controlled fleet access
A fleet depot may need charging restricted to authorised drivers. We plan the controls around the vehicles and staff using the site, so charging information and access stay manageable.
Leased or multi-tenant premises
Shared buildings often need clear responsibility for installation, electricity use and maintenance. We set out the practical requirements before work starts, so landlords and occupiers know how the charging area will be managed.
Preparing for more electric vehicles
If the number of electric vehicles is likely to grow, we can plan cable routes and charging capacity with that change in mind. This reduces the risk of having to disturb finished areas later.
Questions to ask before installing commercial EV charging
How much does commercial EV charger installation cost?
Your electricity supply, parking layout and vehicle patterns determine the installation. We survey these first, then recommend charging capacity, access controls and cabling that fit daily operations without unnecessary work.
How many charge points does a commercial site need?
The right number depends on vehicle movements, parking duration, charging speed and planned growth. We model departures and returns, then phase installation to match demand without overbuilding for now.
What site surveys are needed for commercial EV charging?
We inspect the electrical intake, distribution board, cable routes, parking layout, access, lighting and ground conditions. The survey also identifies permissions, protection requirements and future expansion points before work starts.
What ongoing maintenance does commercial EV charging need?
Routine maintenance keeps charge points safe and available. We inspect connectors, cables, protection devices and software settings, record faults, and recommend repairs before they interrupt staff, visitor or fleet charging.
What electrical upgrades might commercial EV charging require?
Older premises may need a larger distribution board, upgraded protective devices or a new supply connection. We confirm earthing and fault protection, then coordinate approved electrical work before chargers operate.

From fleet planning to a working workplace charging installation
An employer needs workplace charging for staff and pool vehicles, but its supply and parking arrangements aren’t designed for several cars charging together. The facilities manager also wants drivers to use the points without adding a daily admin task.
During assessment, we check the intake equipment, routes to each bay and the charging pattern across the working day. We recommend shared AC points and control settings, then explain any supply upgrade, groundwork or access arrangement before work starts.
On installation day, we agree the work area, protect surfaces and test every connection. At handover, drivers receive operating instructions, while the manager gets commissioning paperwork and a record of how the system is set up.
Commercial charging planned around the site
On a recent workplace installation, shared AC points served staff and pool vehicles without creating a daily task for the facilities manager. We recorded the final configuration, giving the site a clear reference for future maintenance and expansion.